Welcome to ORION
|
|
|
Ron Visits & Helps Out
|
|
|
Laying Fiber Optic Cable
|
|
|
Filling the Trench.2
|
|
|
Finished Trench
|
|
|
Fiber & Power Trench Along Observatory Row
|
|
|
Installation of Pull Boxes
|
|
|
Fiber Conduit Enters Pull Box
|
|
|
Finish Pull Box Installation
|
|
|
Looking Towards Jays Observatory Column
|
|
|
Looking East From Peters Observatory
|
|
|
Conduit Installation Up Observatory Leg
|
|
|
Observatory Conduit Close-Up
|
|
|
Electrical Installation
|
|
|
Construction of Dome Caddy for Batteries & Slot Electronics
|
|
|
Finished Dome Caddy
|
|
|
Installed Dome Caddy
|
|
|
Dome Control Electronics
|
|
|
Finish Dome Control Electronics
|
|
|
Dome Control Electronics Slot1
|
|
|
Dome Control Electronics Slot2
|
|
|
Dome Control Electronics Slot3
|
|
|
Dome Control Electronics - Rotation
|
|
|
Dome Control Electronics Close-Up - Rotation
|
|
|
Dome Control Electronics Close-Up - Rotation1
|
|
|
Dome Control Electronics Close-Up - Rotation2
|
|
|
Wiring Dome Motors
|
|
|
Wiring Dome Motors Close-Up
|
|
|
Solar Panel
|
|
|
Wiring Solar Panel
|
|
|
Finished Solar Panel Installation
|
|
|
Fan Installation1
|
|
|
Fan Installation2
|
|
|
16" Pier Top
|
|
|
Installation of Sub Pier
|
|
|
Finished Pier
|
|
|
Installation of Paramount ME Mount
|
|
|
Pete Looks It Over
|
|
|
Wiring the Mount
|
|
|
Ready To Test Dome Control
|
|
|
Dome Wiring 1
|
|
|
Dome Wiring 2
|
|
|
Kieth Takes A Break
|
|